Redding Water DamageRestoration · Shasta County (888) 774-960524/7

Drying estimator

Drying Time Estimator for Redding, CA

Pick the class of the loss, the season and how quickly drying began. The estimate shows a typical number of days before equipment comes out.

Why drying takes as long as it does

IICRC S500 is the industry drying standard. The drying team maps moisture on day one, sets air movers and LGR dehumidifiers to the evaporation load of each room, and takes readings every day. The drying goal is a reading within 2 to 4 points of a dry reference material in the same building.

  • A contained Class 1 loss usually dries in three to five days.
  • Hardwood, plaster and concrete are Class 4 and can take a week or more.
  • Redding winters add moisture to the air, so the house stays closed and dehumidifiers work harder.
  • Crawlspaces dry on their own schedule and are checked from above and below.

See structural drying in Redding for how the equipment is set up.

24/7 water damage restoration

Drying equipment belongs there until the readings say dry

The drying team logs moisture daily and pulls equipment only when the numbers match a dry reference.

(888) 774-9605Get the drying equipment set

Redding, Shasta Lake, Anderson and Palo Cedro

Call (888) 774-9605